| LEMERY, BATANGAS | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| SURVEYED PAVEMENT DISTRESS IN UNION STREET | |||||||||
| Defect(s)/Deficiencies | Estimated Quantity | Unit of Measure | Remarks | Length | Width | Depth | No. of Slab | Latitude | Longitude |
| Total: 96 | |||||||||
| Broken Humps | 3.6 | sq. m | 6 m | 0.6 m | 8 | 13.8755727 | 120.9151693 | ||
| Pothole | 0.0415 | sq. m | Dia. 23 cm | 13 | 13.8758392 | 120.9151719 | |||
| Valenzuela St/In | 15 | 13.876053 | 120.9150302 | ||||||
| Pothole | 0.04154 | sq. m | dia. 23 cm | 21 | 13.8760975 | 120.9150236 | |||
| Major Wornout surface | 27.9 | sq. m | 25 | 13.8763122 | 120.9149289 | ||||
| 28 | 0 | 0 | |||||||
| Diagonal Crack | 3 | l.m | 3 m | 4 cm | 1 cm | 29 | 13.8764108 | 120.9149049 | |
| Lozada St/In | 33 | 13.8765765 | 120.9147977 | ||||||
| Wornout surface | 0.093 | sq. m | 6.2 cm | 1.5 m | 1.5 cm | 38 | 13.8767228 | 120.9151107 | |
| transverse crack | 0.062 | l.m | 6.2 cm | 3 cm | 1 cm | 49 | 13.8768716 | 120.9149959 | |
| Mabini St/In | 55 | 13.8773077 | 120.9147392 | ||||||
| extreme wonout surface | 27.9 | sq. m | 60 | 13.8774219 | 120.9146315 | ||||
| transverse crack | 6.2 | 6.2 l.m | 6.2 m | 4 cm | .8 cm | 63 | 13.8775481 | 120.9145002 | |
| Diagonal crack | 0.031 | 0.031 l.m | 3.1 cm | 3.5 cm | 2 cm | 70 | 13.8777489 | 120.9143992 | |
| J.P. Rizal St/In | 73 | 13.877972 | 120.9142586 | ||||||
| minor wornout surface | 27.9 | sq. m | 77 | 13.8779833 | 120.9142614 | ||||
| Depressions | 16.2 | sq. m | 4.5 m | 3.6 m | 82 | 13.878146 | 120.9141767 | ||
| popouts | 27.9 | sq. m | 84 | 13.8782584 | 120.9140905 | ||||
| Minor wornout surface and popouts | 195.3 | sq. m | 85 | 13.8782731 | 120.914027 | ||||
| Gen. Luna St/In; /E | 96 | 13.8783073 | 120.913982 | ||||||
| Note: | Legend: | /E - End | |||||||
| 1. The data is surveyed last February 22, 2022. | /In - Intersection | ||||||||
| 2. The unit of measure l.m denotes linear meter. | |||||||||